FIBRE OPTIC roll-out CERCS-BAGÀ | 14,744 LM

Sobre la obra

Fibre optic roll-out — CERCS-BAGÀ corridor

Cubic Estudi d’Enginyeria led the engineering and site management for the fibre optic roll-out in the Cercs-Bagà corridor in Barcelona. The intervention covered 14,744 LM of new infrastructure.

Scope of the project

Engineering, civil works and site supervision

The project included drafting the technical project, supervising the civil engineering works, managing trenching and cable laying, and coordinating with local authorities and contractors. Each phase was planned to meet quality standards, regulatory requirements and the operational timelines of the client network.

Result

A reliable fibre-optic infrastructure delivered with full coordination, ready to support the network operator’s services in the area.

Información

Cliente:
CTTI
Categoría:
TELECOMUNICACIONES
Superfície:
14,744 LM
Ejecución:
2021