FIBRE OPTIC roll-out Tarragona | 274,869 LM

Sobre la obra

Fibre optic roll-out — Tarragona roll-out

Cubic Estudi d’Enginyeria led the engineering and site management for the fibre optic roll-out in the province of Tarragona. The intervention covered 274,869 LM of new infrastructure.

Scope of the project

Engineering, civil works and site supervision

The project included drafting the technical project, supervising the civil engineering works, managing trenching and cable laying, and coordinating with local authorities and contractors. Each phase was planned to meet quality standards, regulatory requirements and the operational timelines of the client network.

Result

A reliable fibre-optic infrastructure delivered with full coordination, ready to support the network operator’s services in the area.

Información

Cliente:
INFRAESTRUCTURES.CAT
Categoría:
TELECOMUNICACIONES
Superfície:
274,869 LM
Ejecución:
2022