FIBRE OPTIC trunk Borredà-Castell de l’Areny

Sobre la obra

Fibre optic roll-out — Borredà-Castell de l’Areny trunk

Cubic Estudi d’Enginyeria led the engineering and site management for the fibre optic roll-out in the Borredà – Castell de l’Areny corridor.

Scope of the project

Engineering, civil works and site supervision

The project included drafting the technical project, supervising the civil engineering works, managing trenching and cable laying, and coordinating with local authorities and contractors. Each phase was planned to meet quality standards, regulatory requirements and the operational timelines of the client network.

Result

A reliable fibre-optic infrastructure delivered with full coordination, ready to support the network operator’s services in the area.

Información

Cliente:
INFRAESTRUCTURES.CAT
Categoría:
TELECOMUNICACIONES
Ejecución:
2022

Obras relacionadas

Empresa del grupo Cubic corp

C/Ciutat Elx 19,
08027 Barcelona
© 2026 – CUBIC CORP, S.L