Sobre la obra
Cubic Estudi d’Enginyeria led the engineering and site management for the connection of 131 sites for CTTI – DIBA-VDF across Catalonia. The project included drafting the technical projects, coordinating civil works and supervising the deployment of the fibre-optic infrastructure for every site.
A multi-site programme with strict timeline and operational requirements, delivered in close coordination with the client and the local authorities involved.
Información
Empresa del grupo Cubic corp